To the central content area

2019 Chiayi City National Water Environment and Clean River Plan

Absrtact
Summary of Project Results 1. Project Description: “2019 Chiayi City National Water Environment and Clean River Plan” 2. Executive Unit: GEGA ENGINEERS & CONSULTANTS CO., LTD. 3. Project Manager: Vice GM Chen, Wei-Hsien 4. Project Start Time: April 12, 2019 5. Project End Time: November 30, 2018 6. Completion Time for Revised Final Report: December 16, 2019 7. Project Budget: NT$ 5.26 million --“2019 Chiayi City National Water Environment and Clean River Plan” 8. Language: Chinese 9. Keywords in Chinese/English: 清淨河面、河面垃圾、河面垃圾清除及清運/ Clean river, River garbage, Clearance and collection of river garbage 10. Abstract: ( A ) , the river stopped garbage addition to network settings 1. Proposed erection site and related instructions This project in 108 years 6 Yue 17 return day reported that the river garbage Trash facility set planning report, under this report 3.2 Jie planning approach proposed river rubbish stopped except network erection site and related instructions, EPA was 108 years 6 Yue 25 Approved . 2. Set up at least 5 river garbage collection nets This project in 108 years 6 Yue 17 Ri to good work ( Ka ) Zi 10,806,028 No. escalation river trash Trash facility set planning report, under this report 3.2 Jie planning approach proposed river rubbish stopped except network erection site and instructions EPA to 108 in 6 Yue 25 Ri approved. This plan then in 108 years 7 Yue 6 Ri for Chiayi north row Restoration section, said the Shenzhen Xinmin road, road and Wu Feng Lun Tsai top Chun drainage Hing Dragon Bridge and other 4 point position execute the river rubbish bar in addition to facilities set up to work, and the other in 108 years 7 Yue 21 Ri for deer Liu drainage, Jiayi north row Xuan Ming bridge , the village drainage goodness bridge drainage Jiaxing bridges, central drainage under Pi segment and Pi Ma foot 5 at the point for the implementation of river trash bar in addition to facilities set up to work, in addition to bar facilities set up in the results of the report are also 108 years 7 Yue 24- return day delivery. 3. Detention facility maintenance and management This project will then start regular monthly plan for the city's 16 river where trash bar in addition to facilities performing maintenance management, statistical date of this report 11 Yue 28 dead per day point total to perform 8 times, each time to perform maintenance facilities During work, check the blocking nets of the blocking facilities, the fixed ropes of the blocking facilities, the fixed base and the water level of the river one by one for any abnormalities, and keep a detailed record of each maintenance situation, and also maintain the records before the 5th of each month The same monthly report was also submitted . ( B ) , river trash removal 1. Regularly inspect each river and the drainage and rainwater drainage into the river This weekly program 2 times each inspection area of the river and into the river drainage, rainwater drainage. This project from 108 in 4 Yue 12 date, the implementation of a week at least 2 times each inspection area of the river and into the drainage, rainwater drainage, ditch and side channel of the river to work, to human-site inspection way to the river city garbage in addition to blocking point and along the river to carry out inspections and drainage routes, this project as of the date of this report statistics 108 on 11 Yue 28 only, the cumulative points have switched each complete 58 followed by inspection operations 2. At least two river surface rubbish removals must be performed each month As of the reporting deadline statistics 108 years 11 Yue 28 only, the cumulative perform 92 times the river garbage cleanup, where cattle thick Creek Watershed perform 56 times cleanup, total 54,934.2 kilograms, execution Bazhang River Basin 36 times cleanup, meter 106,855.1 Kg, a total of 161,789.3 kg cleared . 3. When the public expresses their opinions or reports, they should be cleared within 3 hours. As of this report deadline statistics 108 years 11 Yue 28 stop date, the project has received a total of 4 Jian petition cases, of which 2 member is a public petition cases, 2 Jian reported cases is miles long and river patrol team, this project All were processed within 3 hours after receiving the notification . (C) , the river garbage removal data Escalation 1. Monthly report The plan submits monthly work reports in accordance with regulations before the 5th of each month . As of the statistical deadline of this report, a total of 8 submissions have been made with an implementation rate of 100% . 2. Report monthly results of the previous month On the 5th of each month , the removal results of the previous month are reported in the "Water Garbage Information Management System", and a total of 92 removal results have been completed . (D) , surface water garbage bar in addition to the results of the assessment 1. Implementation of surface water waste "removal operation and image recording " After each garbage removal operation is completed, relevant information such as the amount of garbage to be removed, the type of water body, the river to be removed, and inspection photos are uploaded to the surface water waste rejection management system. A total of 92 reports of removal results have been completed . 2. Perform river waste sorting operation As for the report statistical date, this project designated garbage classification for the river, this project was 5 to perform May 1 times, 9 execution month 19 times, 10 executed May 16 , for a total implementation of 36 , followed by river designated garbage classification Each quarter , the assessment index of the project is reached . 3. Handle clean stream activities or press releases This project in 108 years 9 Yue 21 days, to assist with Bazhang River Water Park "World Rivers Day in Ka guard Bazhang River" net Creek cum advocacy activities, also in line with the other team after Lake Road and the Shenzhen team such as this City water environmental patrol teams each handle 1 sessions net river activities , this year's total handle 3 sessions net river activities . (E) , the other with administrative matters 1. Education and training for executives In accordance with the contractual provisions shall be in the awarding 2 handle education and training in the months before the event and to 15 return day delivery plan, and apply after 10 days be submitted to the results report. This project was 108 in 5 Yue 27 return day delivery of education and training plan, and to 108 in 6 Yue 11 Ri apply for education and training, then the day after the results of the training and be submitted to the Education Report. 2. Cooperate with water saving and pollution reduction publicity activities This joint project also warn that declared handled through the various departments within the bureau activity guide, this year with a total of 2 outreach activities of screenings, participate in outreach activities totaling 54 people . 3. Cooperate with the observation activities of the water patrol team The plan has cooperated with the water environment patrol team observation activities.
Keyword
Clean river, River garbage, Clearance and collection of river garbage
Open
top